PricesFree tool

What whole buildings work sells for

Read from 595 UK public contract awards. Every figure below states how many jobs are behind it.

What it went for

£1,102,500

the middle of 595 awards, from £2,000 to £24,000,000

Half of all whole buildings awards fell between £179,859 and £4,762,737.

£2,000The scale steps by tens, so the smallest job and the largest both fit on it.£24,000,000

Against the estimate

Awarded at the estimate.

40% underthe advertised estimate40% over

77 of these jobs advertised an estimate before bids came in

How long the decision takes

117 days from advert to award. 5 days longer than the all-trades middle of 112 days.

0 days150 days

the middle of 89 jobs whose advert and award were both published

When whole buildings work comes out to bid

October is the busiest month and April the quietest — 256 against 118, across 7 full years.

  1. January: 182 advertised
  2. February: 171 advertised
  3. March: 143 advertised
  4. April: 118 advertised
  5. May: 165 advertised
  6. June: 152 advertised
  7. July: 220 advertised
  8. August: 195 advertised
  9. September: 249 advertised
  10. October: 256 advertised
  11. November: 225 advertised
  12. December: 176 advertised

counted on tenders advertised, which is what a contractor plans around — a month with nothing held is shown as a dash, never a zero

Where these figures come from

Every figure is read from contract award notices published by UK public bodies — councils, NHS trusts, housing associations, government departments — under the Open Government Licence. Nothing is estimated, modelled or filled in. A figure appears only once enough awards support it, and it always states how many.

The figures are rebuilt each night, last on 6 August 2026. They cover publicly tendered work, which is not the same as domestic or private commercial work: a price here is what a public body paid a contractor on a contract that went through a formal tender.

Pricing a job like these?

HubTrack is where small construction firms keep their compliance documents, their jobs and their evidence trail in one place — method statements and risk assessments prepared for you to check and sign off, and a record of who signed what and when. The same engine that reads the contract documents behind this page reads yours inside HubTrack.

You always know what to do next.

Or just take the numbers and go — that is allowed.