What electrical work sells for

Read from 180 UK public contract awards. Every figure below states how many jobs are behind it.

What it went for

£146,686

the middle of 180 awards, from £6,625 to £7,500,000

Half of all electrical awards fell between £54,840 and £401,222.

£6,625The scale steps by tens, so the smallest job and the largest both fit on it.£7,500,000

Against the estimate

Awarded 14% under the estimate.

40% underthe advertised estimate40% over

23 of these jobs advertised an estimate before bids came in

How long the decision takes

164 days from advert to award. 52 days longer than the all-trades middle of 112 days.

0 days200 days

the middle of 28 jobs whose advert and award were both published

When electrical work comes out to bid

November is the busiest month and April the quietest — 83 against 28, across 5 full years.

  1. January: 46 advertised
  2. February: 61 advertised
  3. March: 54 advertised
  4. April: 28 advertised
  5. May: 38 advertised
  6. June: 54 advertised
  7. July: 58 advertised
  8. August: 63 advertised
  9. September: 67 advertised
  10. October: 74 advertised
  11. November: 83 advertised
  12. December: 60 advertised

counted on tenders advertised, which is what a contractor plans around — a month with nothing held is shown as a dash, never a zero

Where these figures come from

Every figure is read from contract award notices published by UK public bodies — councils, NHS trusts, housing associations, government departments — under the Open Government Licence. Nothing is estimated, modelled or filled in. A figure appears only once enough awards support it, and it always states how many.

The figures are rebuilt each night, last on 6 August 2026. They cover publicly tendered work, which is not the same as domestic or private commercial work: a price here is what a public body paid a contractor on a contract that went through a formal tender.

Pricing a job like these?

HubTrack is where small construction firms keep their compliance documents, their jobs and their evidence trail in one place — method statements and risk assessments prepared for you to check and sign off, and a record of who signed what and when. The same engine that reads the contract documents behind this page reads yours inside HubTrack.

You always know what to do next.

Or just take the numbers and go — that is allowed.